1. Which is the highest organisational level in SAP
a) Plant b) Client c) Storage Location
Ans: b
2. For Material Master record PP Data which is the highest organisational level
a) Plant b) Client c) Storage Location
Ans: a
3. What is the difference between F1 Help & F4 Help.
a) F1 is for possible values and F4 is for application help
b) F1 is for Application Help and F4 is for Technical Help
c) F1 is for Field Help and F4 is for possible entries.
d) None of the above
Ans: c
4. Variant Configuration is typically used in
a) Make – to – stock Environment
b) Make – to – Order Environment
c) Spare parts Sale
d) Repetitive Manufacturing Environment
Ans: a
5. Configurable Material check for a material is set in _____________
a) Basic Data b) MRP View
c) Sales View d) Classification
Ans:
6. Basic Data screen contains general data such as
a) Material Number
b) Material description
c) Base unit of measure
d) Technical data
Ans: a, b, c
7. Functions of Classification are
a) To find an appropriate object
b) To find similar objects
c) To establish that no appropriate object exists.
Ans:
8. Entering “/o” in command field
a) Ends current transaction
b) Ends the current cession
c) Opens new cession
d) Opens new transaction
Ans:
9. For creating Material Master the following Transaction Code is used :
a) md01
b) mm01
c) me01
d) mc01
Ans: b
10. The unit in which the stock keeping is done in a company is called
a) Stock unit of measure
b) Base unit of measure
c) Unit of issue
d) Purchase unit of measure
Ans: b
11. Batch is
a) Same as material code
b) Partial quantity of material managed separately from other quantity of same material in stock
c) A non reproducible homogeneous unit with unique specifications
d) None of above
e) All of above
Ans: b
12. A _____________________________ is a complete, formally structured list of the components that make up a product or assembly.
Ans:
13. Component in the BOM are allocated to operation in
a) BOM
b) Material Master
c) Routing
d) Work Center
Ans: c
14. BOM contains the following
a) List of Components
b) Qty of Components
c) Operation to which components is attached.
d) Unit of Measure of components
Ans: a, b, d
15. BOMs are always created as
a) Single Level
b) Multi Level
c) Components
d) Along with routings
Ans: a